News and Events

 

Construction and implementation of SWINGS pilot plants

During 2014-2015, the SWINGS pilot plants based on anaerobic digestion technology, vertical and horizontal constructed wetlands, solar-driven disinfection systems and bank filtration methodologies have been implemented on the selected SWINGS sites of AMU, KALYANI and IGNTU.

AMU site 

Large AMU pilot plant for 1000 PE

AMU siteAMU cartel

 

Foundation and implementation of the Equalization Tank and UASB reactor

AMU-equ tankUASB

 equalis tank AMUUASB AMU

 

 Loading chamber and syphon system for west VFCW feeding

syphonIsyphonII

load chambersyphon AMU

 siphon final

Vertical and Horizontal CW construction and implementation

AMU HCWAMU VCW 

 CW trains AMU

sand filled VF AMUHF distribution AMU

 AMU large with sand

large plant final

 

Laboratory and disinfection building

lab disinfec final

 solarpanels final

desinf systems final

 

Small AMU pilot plant for 30 PE (French system)

 

 AMU FSAMU FS II

 AMU FS IIIAMU FS IV

 AMU FS V

 

 

Video for AMU pilot plants and SWINGS project 

SWINGS Video for AMU pilot plants elaborated and presented by Dr. Cristina Avila

 

KALYANI site 

Ponds for RBF processes

RBFiRBFii

 Foundation of the house for Disinfection systems

 RBFiii

 Drilling and pumping test of the 1st BF well

RBF ivRBF v

 

KALYANY disinfection system building

final BF KU

 

 

Video for River Bank Filtration operation and implementation 

 

 

IGNTU site

Lalpur village

Construction of house and pump well for ground water AO disinfection

IGNTU1IGNTU well

  

Solar-driven AO disinfection for drinking water

 IGNTU tower

  

Amarkantak

 Horizontal gravity fed gravel filter bed for AO disinfection of an Treatment Plant effluent

IGNTU filterIGNTU filterII 

 

 Installed water disinfection unit

Amark IIbAmark IIAmark I

Amark III

 

SWINGS WP3 technical meeting at AMU

Technical discussion related to SWINGS pilot plants implementation at Department of Civil Engineering of AMU (Aligarh, India).

26 November 2014

meeting Nov14

 

Forthcoming SWINGS Training Workshop for Research Scholars

Young Scientists and Project Staff from other projects (SARASVATI, NAWATECH, ECOINDIA) going to be held at AMU from 5th to 6th June 2014. The purpose of this workshop is to aware other projects about SWINGS Technical Activities and knowledge sharing.

In addition, World Environment Day  was celebrated on the 5th June 2014. SWINGS was one of the Co-sponsored of the programme organized by Institution of Engineers, Aligarh Centre. All the participants of the training programme had attended this event as well. P.Is of the SWINGS (Dr. Nadeem -AMU- and Dr. Virendra -IGNTU) had given presentation in this programme. This programme was attended by a large number of engineers, govt. officials etc

5-6 June 2014

trainingI

trainingII

trainingIII 

 

SWINGS WP2 technical meeting at UPC

Technical discussion related to SWINGS pilot plants and technical tour provided by Deptartment of Hydraulics, Maritime and Environmental Engineering (DEHMA) at Technical University of Catalonia (UPC).

7-8 October 2013

 

UPC technical meeting global

foto plant UPC

 

UFZ Wetland Workshop

 Discussion and collaboration between research institutions, private sector, and other supporting organizations working in the field of treatment wetlands. Mosto of SWINGS EU partners attended this interesting workshop organised by UFZ.

 

12-14 June 2013

UFZ workshop group1

 

UFZ site

 

 

SWINGS news on DHI website

Newsletter

SWINGS dissemination

 

 

SWINGS Kick-off Workshop Cum 1st Global Partners Meet

AMU (Aligarh) and IITD (Delhi) (India)

 

22-25 April 2013

 

KO AMU

 

KO Aligarh

 

 

 Kick-off meeting of the EU-India water related projects

Indian Institute of Science, Bangalore (India)

10 October 2012

KO Bangalore 

 

 

SWINGS Kick-off meeting at AIMEN Technology Centre (Spain)

26-27 September2012

KO AIMEN

Links to local press news:

Faro de Vigo

La Voz de Galicia

 

 

This project has received funding from the European Union's Seventh Framework Programme for research, technological development and demonstration under grant agreement N° 308502

 